GM and ChargePoint plan to install hundreds of fast EV chargers by the end of 2025

a rest stop with many charging stations with branding from both GM Energy and Chargepoint, a red GMC Denali EV is parked at one spot.
A station render with Chargepoint-built GM Energy chargers. | Image: GM

GM is partnering with ChargePoint to build out a new EV charging network under the GM Energy brand, the companies announced today.

GM plans to install up to 500 DC fast-charging ports at stations deployed in “strategic” places across the US, with some equipped with ChargePoint’s Express Plus platform that supports charge speeds up to 500kW. GM and Chargepoint plan to open the stations “rapidly, with the locations deployed by the end of 2025.”

ChargePoint will bring its Omni Port charging hardware for the project, which can connect with vehicles fitted with either CCS or Tesla’s NACS ports so that owners generally would not need to carry an adapter.

“With ultra-fast charging, Omni Port technology, and excellent customer experiences, this collaboration should be another reason why EV drivers and the EV-curious should be excited,” GM Energy VP Wade Sheffer said in a statement.

This isn’t GM Energy’s only EV charger partnership. The automaker also has an ongoing deal with EVgo that has already installed 2,000 DC fast chargers as of December. GM is also building stations with Flying J and Pilot truck stops, while also taking a role in the EV charging consortium Ionna with major players like Hyundai, Kia, BMW, and Stellantis.

source https://www.theverge.com/2024/12/18/24324512/gm-chargepoint-dc-fast-charger-network

Leave a Reply

Your email address will not be published. Required fields are marked *